GeTS Portal can be accessed by choosing an Action code: 1 – Arrive the entire in‑bond at the destination and provide the following information:
In-Bond Entry Number: The main number identifying the in-bond to CBP. Should be 9 numeric digits, with no spaces, dashes or other characters.
US In-Bond Destination/Port of Arrival: The CBP port that the in-bond shipment is destined to must also match the destination port of the in-bond itself.
In-Bond Arrival Date: The date that the in-bond shipment arrived at the destination port. This date must not be in the future, as the in-bond arrival cannot be reported before it happens. In-bond arrivals are required by regulation to be reported within 2 business days.
In-Bond Arrival Time: The specific time the in-bond shipment arrived at the destination port.